Intelligent ventilation system

Intelligent ventilation system

Client

The Hungarian production plant of one of the world's leading car manufacturers.

Industry

Automotive

Situation

The heating control was manually adjusted in our client’s premises, so the temperature was often not corrected or not corrected in time. As a result, the hall was often overheated.

In addition, the old PLC control was able to intervene locally (on top of the hall). The layout of the hall had changed since the installation, so the system planned at the time was no longer relevant.

Our solution

The aim was to prepare the hall for expansion, optimise energy consumption, automatic temperature control, the data can be retrieved and remotely interfered with.

The upgrade results in state-of-the-art operation and an investment that pays for itself in a short time through energy savings.

Within the framework of the project, the following tasks were carried out:

The upgrade results in state-of-the-art operation and an investment that pays for itself in a short time through energy savings.
003_Eredeti_kialakitas23 (1) 007_Beuzemelt_allapot23 (1)